On the inside looking out
Colour photograph (C-type) by Tim Knifton


  • Colour photograph (C-type), Paper
  • From a limited edition of 5
  • Size: 18 × 12 in (unframed) / 18 × 12 in (actual image size)
  • This artwork is sold unframed
  • Signed and numbered certificate of authenticity

Free Returns

  • Artwork description
  • Shipping
  • Returns and refunds
    Artfinder guarantees absolute satisfaction. If you are not completely satisfied with your purchase you can return it free within 14-days, no questions asked. We will arrange a shipment to collect your art and refund you fully, including any associated shipping charges.
  • Reviews (5)

Tim Knifton

United Kingdom

Question for the artist?

Artist's description:

Abandoned hotel in Pripyat's main square.

Named for the nearby Pripyat River, Pripyat was founded on 4 February 1970, the ninth nuclear city in the Soviet Union, for the Chernobyl Nuclear Power Plant. It was officially proclaimed a city in 1979, and had grown to a population of 49,360 before being evacuated a few days after the 26 April 1986 Chernobyl disaster.

Though Pripyat is located within the administrative district of Ivankiv Raion, the abandoned city now has a special status within the larger Kiev Oblast (province), being administered directly from Kiev. Pripyat is also supervised by Ukraine's Ministry of Emergencies, which manages activities for the entire Chernobyl Exclusion Zone.

Access to Pripyat, unlike cities of military importance, was not restricted before the disaster as nuclear power stations were seen by the Soviet Union as safer than other types of power plants. Nuclear power stations were presented as being an achievement of Soviet engineering, where nuclear power was harnessed for peaceful projects. The slogan "peaceful atom" (Russian: mirnyj atom) was popular during those times. The original plan had been to build the plant only 25 km (16 mi) from Kiev, but the Ukrainian Academy of Sciences, among other bodies, expressed concern about it being too close to the city. As a result, the power station and Pripyat were built at their current locations, about 100 km (62 mi) from Kiev. After the disaster the city of Pripyat was evacuated in two days.

Materials used: